TerraMCP · Directory · Connect

dataset · England

Climate change allowances - peak rainfall by management catchment

This dataset contains peak rainfall allowances showing the anticipated changes to peak rainfall by management catchment. It contains information generated by Met Office Hadley Centre The Environment Agency provides peak rainfall allowances in the advice it gives for flood risk assessments and strategic flood risk assessments (https://www.gov.uk/guidance/flood-risk-assessments-climate-change-allowances) and for risk management authorities when claiming Flood & Coastal Erosion Risk Management Gran

Visit source ↗

Source details

Licence: ["There are no public access constraints to this data. Use of this data is subject to the licence identified.", "There are no public access constraints to this data. Use of this data is subject to the

Evidence quality: 57

Listed in data.gov.uk public catalogue API on 2026-10-16; relevance/value screened (haiku).

Metadata checked: 2026-10-14T13:20:00.000Z

What's in it

Data offered docs-verified
peak rainfall allowances · anticipated changes to peak rainfall by management catchment
Coverage docs-verified
England (ENTRY regions); docs extent lat 49.943 to 55.816, lon -6.236 to 2.072 · 2050s epoch (2040-2059) and 2070s epoch (2060-2080)
Resolution llm-inferred
Management catchment level; two future time-slice epochs (2050s, 2070s); no finer spatial or temporal resolution stated
Update frequency docs-verified
Irregular
Formats docs-verified
OGC API - Features · WFS · WMS · GeoPackage · Shapefile · GeoJSON · File Geodatabase · TXT · LYR
Access docs-verified
Free/open, no authentication; Open Government Licence

Useful for

Use cases llm-inferred
FRA and strategic flood risk assessment: applying climate change peak rainfall allowances by management catchment for 2050s and 2070s · Drainage strategy: climate-adjusted peak rainfall inputs for design storms in England · FCERM Grant-in-Aid project or scheme business cases: catchment-level climate allowance evidence
Audience llm-inferred
flood risk consultants · drainage engineers · hydrologists · GIS analysts · planners

Limitations

Constraints llm-inferred
Only two future time-frames (2050s and 2070s) are provided · Only central (50th percentile) and upper end (95th percentile) allowances are described · Update frequency is irregular, so the data may not reflect the latest guidance · Extent covers a bounding box wider than England, so coverage outside England should be checked · Rainfall allowances only, not river flow allowances

Evidence

Check upstream coverage, uncertainty and licence before use. Station observations are not forecasts or design levels.