horizun-msproject-mcp
MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.
Feature or claim this listing
Feature this listing — founding Featured slots are 50% off for 6 monthsRepresent horizun-msproject-mcp? Send a claim for review so we can discuss listing updates. Claims do not automatically grant ownership or verification.
What's in it
- Data offered docs-verified
- critical path · float distribution · driving path · day-by-day resource overallocation · DCMA-14 assessment · earned value (BCWS/BCWP/ACWP, SPI, CPI, EAC, TCPI) · quantitative schedule risk (Monte Carlo P10/P50/P80/P90) · period status report · dry-run schedule change impact
- Coverage llm-inferred
- Global
- Formats docs-verified
- MPP · Primavera XER · MSPDI XML · PMXML · CSV · JSON · Power BI dataset · MCP stdio
- Access docs-verified
- Open source, MIT licence (per entry metadata); no Microsoft Project, JVM or paid licence required; installed as a .NET tool
Useful for
- Use cases llm-inferred
- DCMA-14 schedule quality check on a civils programme before issue · P80 schedule risk contingency from Monte Carlo analysis of a construction programme · Period earned value and status reporting (SPI, CPI, EAC, forecast finish) against a baseline · Linking schedule tasks to BIM model elements by shared code for 4D sequencing
- Audience llm-inferred
- project controls and PMO staff · programme managers · planners and scheduling engineers · BIM/civils engineers
Limitations
- Constraints docs-verified
- write_native_mpp is unavailable on the file backend; without Microsoft Project the save falls back to MSPDI · level_resources refuses on the file backend rather than approximating Microsoft Project's leveller · Moving a task to another position in the outline is not offered · Tool schemas add about 13,500 tokens to every prompt while the server is connected
- Licence
- MIT
- Authentication
- Unknown — review source docs
- GitHub stars
- 7
- Last commit
- 14/10/2026
- Last successful page check
- 14/10/2026
- Page health
- healthy
- Package
- Not recorded
- Verification
- Not independently verified
Auto-extracted, unverified fields: tools, auth. Check upstream documentation.
Provenance & evidence
Tools/install/auth auto-extracted from README; quality score heuristic (stars, recency, tool count, licence).
Metadata observed 16/10/2026 · research sweep: github-search