← Directory
data api · United States
NOAA GEFS forecast, 35 day
time-optimized · Global · variable subset · 0-240h: 0.25°, 243-840h: 0.5° · 0-840h (0-35 days) · every 24h Weather forecasts from the Global Ensemble Forecast System (GEFS) model operated by NOAA NWS NCEP, transformed into Zarr format by dynamical.org.
Feature or claim this listing
Feature this listing — founding Featured slots are 50% off for 6 monthsRepresent NOAA GEFS forecast, 35 day? Send a claim for review so we can discuss listing updates. Claims do not automatically grant ownership or verification.
What's in it
- Data offered docs-verified
- 2 m temperature (instantaneous, min/max and mean) · surface precipitation (instantaneous and mean) · categorical precipitation type (rain, snow, ice pellets, freezing rain) · percent frozen precipitation · 10 m and 100 m wind components (u and v) · 2 m relative humidity · total cloud cover and cloud ceiling height · surface and mean sea-level pressure · downward short-wave and long-wave radiation flux at surface · precipitable water · valid time and forecast length metadata
- Coverage docs-verified
- Global · Forecast initialisations from 2020-10-01 00:00 UTC to present; lead times 0–35 days
- Resolution docs-verified
- 0.25° (~20 km) for 0–240 h lead time, 0.5° (~40 km) for 243–840 h; forecast step 3-hourly to 240 h, 6-hourly thereafter
- Update frequency docs-verified
- Every 24 hours, 00 UTC initialisations only
- Formats docs-verified
- Zarr
- Access docs-verified
- Public, no authentication required (anonymous HTTPS/S3 via data.source.coop); optional email query parameter for usage tracking; licence not stated, see product README
Useful for
- Use cases llm-inferred
- Multi-week temperature and precipitation outlook for construction programme and earthworks weather-risk screening · Ensemble rainfall spread as scenario input for early-stage drainage or surface-water planning sensitivity tests · Regional wind and cloud context for crane lifts, temporary works and site-monitoring scheduling
- Audience llm-inferred
- hydrologists · drainage engineers · flood consultants · civils planners · GIS analysts · geotechnical engineers
Limitations
- Constraints llm-inferred
- Global 0.25°/0.5° grid (~20–40 km) is too coarse for most catchment or site-scale flood and drainage modelling without downscaling · Not UK-specific; no UK Met Office or local bias correction is stated · Only 00 UTC initialisations are included, so intra-day model cycles are absent · Forecast skill declines with lead time; ensemble spread widens beyond about 10 days · Requires Zarr-capable tooling (e.g. xarray) and familiarity with the init_time × ensemble_member × lead_time dimensions · Licence not stated in the docs; check the product README before commercial use · Third-party transformation and hosting (dynamical.org, Source Cooperative) carries maintenance and availability risk
- Licence
- see product README
- Authentication
- Public; anonymous HTTPS/S3 access via data.source.coop
- GitHub stars
- Unknown
- Last commit
- Unknown
- Last successful page check
- 14/10/2026
- Page health
- page reachable
- Package
- Not recorded
- Verification
- Not independently verified
Provenance & evidence
Verified via Source Cooperative API /api/v1/products/dynamical (public product, updated 2026-07-24).
Metadata observed 14/10/2026 · research sweep: manual-2026-10-15 (source.coop)